The other side of the galley is the table and sitting area. This is also where the main AC/DC distribution panel resides. I just want to get it stripped out without damaging the trim.
Like the other side of the galley, this was fairly uninteresting. The only possible exception being the wiring under the after settee.
And it’s really not as bad as it looks since the battery selector switch was on the side and runs to a monitor on the distribution panel. Those battery cables are hella-thick.
And now the floor has to come up so I can see what’s going on with the stringers here and have a look at those big ‘ol water and diesel tanks.
Leave A Comment